SKU:87765009851
Eaton 9355 30kVA 27kW 208/208V 3-Phase UPS w/New Batteries 11-Min Full Load
Free Shipping on orders over $50
Shipping Estimate
USA
- USA
- CAN
- USA
- CAN
Ships within 48 hours · Estimated delivery Jul 12 - Jul 17
Description
Eaton 9355 30kVA 27kW 208/208V 3-Phase UPS w/New Batteries 11-Min Full LoadPreowned Eaton 9355 30kVA 27kW 208 208V 3 Phase UPS w New Batteries 11 Min Full Load. Professionally tested & load banked with new Flame Retardant batteries installed. Technical Specifications for 20 and 30 kVA1 Power Ratings (kVA Watts) 20 kVA 18 kW and 30 kVA 27 kW at 0. 9 power factor Topology Double conversion Electrical Input Nominal input voltage 208V 120V, 220V 127V +10, 15% 480V 277V, 600V (480+600 with transformer) 400V models also available
MGE 6739830 Rev C0 IBEZ PCB Assembly Board
Why Choose the Xtreme J60 UPS
or wall-mount installation
Potter & Brumfield KRPA-11AG-120 Industrial Relay with RS8 PCB Assembly
(1) L5-20R Communications User Interface Clear
Main: (3) C13 outlets
The Xtreme Power Conversion P80 Series P80-800 is a compact 2U rackmount/tower line-interactive UPS designed to provide reliable battery backup and voltage regulation for network closets
Weight: 24
Square D KHF3620022DC2315 200A 3-Pole Circuit Breaker
Fully Populated with 32 SYBTU-1 Battery Modules
4kW 208V-120/240 Hardwired In/Out UPS
APC 21466-1 Board PCB Assembly
Easy Shipping
Quick Dispatch:
Your Eaton 9355 30kVA 27kW 208/208V 3-Phase UPS w/New Batteries 11-Min Full Load orders ship within 1-2 business days.
Delivery Options:
- Standard: 3-7 business days
- Fast: 2-3 business days
- Express: 1-2 business days
Order Tracking:
You'll receive a tracking link by email once your Eaton 9355 30kVA 27kW 208/208V 3-Phase UPS w/New Batteries 11-Min Full Load ships.
Need Help?
Questions about Eaton 9355 30kVA 27kW 208/208V 3-Phase UPS w/New Batteries 11-Min Full Load, sizing, or delivery? We're just an email away.
Live Shipping Estimates:
Enter your location at checkout to see available shipping methods and costs for Eaton 9355 30kVA 27kW 208/208V 3-Phase UPS w/New Batteries 11-Min Full Load in your area.
Get Shipping Estimates
Exchange/Return Notes
- We offer a 30-day return/exchange service after receiving.
- Final sale items are not eligible for returns or exchanges.
- To process your return/exchange, please contact us at [email protected]
- Please click here for more details>>> Return & Exchange Policy
You may also like
Hawkins Wall Sconce
686.00
★★★★☆4.8 (126)
Hampton Pendant
320.25
★★★★★4.9 (98)
Mitsubishi A070218-H01 UPFR-X ZE0748-H62 UPS PCB Board Assembly
250.00
★★★★★5.0 (157)
Pelham Pendant
1146.25
★★★★★4.7 (84)
Best Power PCF-0004C 76555 Board PCB Assembly
99.99
★★★★★4.9 (203)
Burlington Pendant
474.25
★★★★★5.0 (176)
LEWISTON CHANDELIER
3263.75
★★★★★4.8 (132)